V2EX = way to explore
V2EX 是一个关于分享和探索的地方
现在注册
已注册用户请  登录
V2EX  ›  DrLeavea  ›  全部回复第 1 页 / 共 1 页
回复总数  2
24 天前
回复了 DrLeavea 创建的主题 职场话题 [求助] 问问大家怎么找兼职
问题问错了,应该问 “问问大家怎么接单”
2023-07-11 12:30:31 +08:00
回复了 DrLeavea 创建的主题 VPS hosteons 网站被攻击了?
好了破案了,机房起火了,应该是前者
Affecting System - New York Datacenter Power Grid Failure

07/11/2023 10:15 Last Updated 07/11/2023 11:08
Power remains off at our data center in Secaucus/EWR1 per the local fire marshal. We have had an electrical failure with one of our redundant UPS' that started to smoke and then had a small fire in the UPS room. The fire department was dispatched and the fire was extinguished quickly. The fire department subsequently cut power to the entire data center and disabled our generators while they and the utility verify electrical system. We have been working with both the fire department and the utility to expedite this process. We are currently waiting on the fire marshal and local utility to reenergize the site. We are completely dependent upon their inspection and approval. We are hoping to get an update that we can share in the next hour. At the current time, the fire department is controlling access to the building and we will not be able to let customers in.

All our KVM VPS, Ryzen VPS and OpenVZ VPS in New York are down due to this power and fire incident. Other locations are not effected. As soon as we have more update, we will share it.

UPDATE 1:

After reviewing the site, the fire Marshall is requiring that we extensively clean the UPS devices and rooms before they will allow us to re-energize the site. We have a vendor at the site currently who will be performing that cleanup. We will provide an update at 8:00AM EDT unless something significant changes overnight.
关于   ·   帮助文档   ·   博客   ·   API   ·   FAQ   ·   实用小工具   ·   1189 人在线   最高记录 6679   ·     Select Language
创意工作者们的社区
World is powered by solitude
VERSION: 3.9.8.5 · 11ms · UTC 18:20 · PVG 02:20 · LAX 10:20 · JFK 13:20
Developed with CodeLauncher
♥ Do have faith in what you're doing.